The Basement


So here are some of the basic plans for our basement. Some of the changes may be that we might be switching from oil to natural gas which would create a possible fourth bedroom in the basement. Ill have to put an egress window but that's no big deal.

Phase 1 has begun. Last weekend I broke out most of the old studs and began the cleanup and organization for construction. I should begin the insulation and framing this month before school starts up again in February.

The Sketch up model is very crude. There is no wall & door to separate the bathroom from the rest of the space, and the Eames lounge chair and Herman Miller Aeron chair are far fetched dreams. Basically all the furniture was downloaded just as stand in’s and do not accurately represent what will fill the given spaces.








What a mess!